Start with questions, not meters
Decide what you need to know. Typical questions are: how much energy do HVAC, lighting and plug loads use; what does each tenant or department consume; how does consumption change out of hours; and how efficient is major plant such as chillers.
What to meter
- Incomers and main distribution: utility supply, DG sets and solar generation where present.
- Major loads: chiller plant, AHUs, pumps, lifts and data rooms.
- Areas and tenants: floor or tenant distribution boards for allocation and billing.
- Other utilities: water and gas where they matter to cost or sustainability goals.
How to connect
Most multi-function meters communicate over Modbus RTU or Modbus TCP. Meters are connected through gateways or data loggers to a monitoring platform or the BMS. Plan addresses, cabling routes and network connections as part of the design, and document register maps for each meter type.
From data to action
- Establish a baseline period before making changes.
- Set alerts for abnormal patterns such as night-time base load.
- Review data regularly with the facility team and track the effect of each measure.
- Use the BMS to act on findings, for example by adjusting schedules and set-points.
Standards and frameworks
Frameworks such as ISO 50001 describe how organisations can manage energy systematically. In India, the Bureau of Energy Efficiency publishes the Energy Conservation Building Code (ECBC) for commercial buildings. Metering data supports both.
References and further reading
- Modbus Organization: Modbus specifications
- ISO: ISO 50001 energy management
- Bureau of Energy Efficiency: Energy Conservation Building Code (ECBC)
This article is general guidance, not design advice for a specific project. Requirements vary by site, occupancy and authority.